Rozwiązania
Redukcja kosztówESG i zgodnośćRozliczenia i zaangażowanie najemcówZarządzanie nieruchomościamiOperacje portfelaUtility Data API
Produkt
PlatformaMonitorowanie energii elektrycznejMonitorowanie wodyMonitorowanie gazuMonitorowanie ciepłaMonitorowanie fotowoltaikiŹródła danychSprzętKonektory mediówInfrastruktura zewnętrzna
Narzędzia
Wszystkie narzędziaKompatybilność licznikówZasięg dostawców mediów
Branże
Wszystkie branżeLogistykaHandel detalicznyBiuraNieruchomości mieszkanioweDomy studenckieHotelarstwoOchrona zdrowia
Studia przypadkówBlogPartnerzy
ENNLDE
Umów demo
Integrated

Is the Landis Gyr UH50 (T550) compatible with remote monitoring?

Yes. Rhino already reads the Landis Gyr UH50 (T550) over M-Bus wired, RS485 Modbus and Wireless M-Bus OMS.

Utility
Heat
Interfaces Rhino reads
M-Bus wired, RS485 Modbus and Wireless M-Bus OMS
MID certified
Not on file for this utility
Software only possible
No, this one needs hardware
Rhino hardware
Confirmed with you before anything is ordered

Coverage reviewed 2026-08-25, and it grows continuously.

The answer that matters

What it takes.

Rhino has the Landis Gyr UH50 (T550) configured already, so the connection is proven rather than probable.
It is read over M-Bus wired and RS485 Modbus and Wireless M-Bus OMS, an interface Rhino connects to directly.
What the install looks like depends on the building and on which version of the meter is installed, so Rhino sizes it with you rather than reading it off a model number. That is one short conversation.
On site

What connecting it involves.

The Landis Gyr UH50 (T550) is read over M-Bus wired, RS485 Modbus and Wireless M-Bus OMS. The expansion device connects to that output and reports to the access point, with no change to how the meter itself operates.

None of this covers site feasibility. RF range, cabinet access and power availability are survey questions, and a compatibility yes is not an installation yes.

Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.

Same manufacturer

Other Landis Gyr meters we read.

ModelUtilityProtocolMID
E350ElectricityAsk usNo
E360ElectricityAsk usNo
ZMD310ElectricityRS232 optic head, IEC1107Yes
ZMD405ElectricityAsk usNo
ZMD410ElectricityAsk usNo
ZMG310ElectricityAsk usNo
ZMG405ElectricityRS232 optic head, IEC1107 and RS485 IEC1107Yes
ZMG410ElectricityAsk usNo

One meter checked. Now do the building.

Send us the meter list for the site and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site. Before anyone talks about price.