Lösungen
KostensenkungESG & ComplianceMieterabrechnung & MieterbindungImmobilienverwaltungPortfoliobetriebUtility Data API
Produkt
PlattformStrommonitoringWassermonitoringGasmonitoringWärmemonitoringSolarmonitoringDatenquellenHardwareUtility ConnectorsDrittanbieter-Infrastruktur
Tools
Alle ToolsZähler-KompatibilitätAbdeckung von Versorgern
Branchen
Alle BranchenLogistikEinzelhandelBüroWohnimmobilienStudentisches WohnenHotellerieGesundheitsimmobilien
FallstudienBlogPartner
ENNLPL
Demo buchen

Which meters can Rhino read over RS485 IEC1107?

Rhino reads RS485 IEC1107 through a Rhino ED RS485, and each meter below carries its own install detail.

Some utility-grade meters expose the IEC 62056-21 data set over an RS485 bus rather than an optical head. The data is the same, the transport is more convenient.

Rhino reads it with an ED RS485. Where a meter offers both this and an optical head, the bus is the better choice: no head to align, and several meters can share the run.

It is most common on main and tenant-boundary meters from the utility-grade ranges.

Rhino device
Rhino ED RS485
Also needed
One Rhino AP per building
Utilities
Electricity
Listed model required
Worth confirming

Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.

Already configured

Meters we have already configured.

Reviewed 2026-08-25, and more are added every few months. If yours is not below, tell us what it is and we will confirm the device you need.

ManufacturerModelUtilityAll protocols on this meterMID
ElsterA1500ElectricityRS232 optic head, IEC1107 and RS485 IEC1107Yes
EMHLZQJ-XCElectricityRS232 optic head, IEC1107 and RS485 IEC1107Yes
Landis GyrZMG405ElectricityRS232 optic head, IEC1107 and RS485 IEC1107Yes
PozytonEQMElectricityRS485 IEC1107Yes
PozytonSQABElectricityRS485 IEC1107 and RS485 ModbusYes

Know the protocol. Now do the building.

Send us the meter list for a site and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site.