Lösungen
KostensenkungESG & ComplianceMieterabrechnung & MieterbindungImmobilienverwaltungPortfoliobetriebUtility Data API
Produkt
PlattformStrommonitoringWassermonitoringGasmonitoringWärmemonitoringSolarmonitoringDatenquellenHardwareUtility ConnectorsDrittanbieter-Infrastruktur
Tools
Alle ToolsZähler-KompatibilitätAbdeckung von Versorgern
Branchen
Alle BranchenLogistikEinzelhandelBüroWohnimmobilienStudentisches WohnenHotellerieGesundheitsimmobilien
FallstudienBlogPartner
ENNLPL
Demo buchen
Integrated

Is the Zener ETKD-N compatible with remote monitoring?

Yes. Rhino already reads the Zener ETKD-N over Pulse / S0.

Utility
Water
Interfaces Rhino reads
Pulse / S0
MID certified
Not on file for this utility
Adapter required
8R MD 2R 1/10
Software only possible
No, this one needs hardware
Rhino hardware
Confirmed with you before anything is ordered

Coverage reviewed 2026-08-25, and it grows continuously.

The answer that matters

What it takes.

Rhino has the Zener ETKD-N configured already, so the connection is proven rather than probable.
It is read over Pulse / S0, an interface Rhino connects to directly.
What the install looks like depends on the building and on which version of the meter is installed, so Rhino sizes it with you rather than reading it off a model number. That is one short conversation.
On site

What connecting it involves.

On a water meter like the ETKD-N, the reading comes off the meter head rather than out of a terminal block. That is what the 8R MD 2R 1/10 is for: it clips to the meter and turns its output into something the Rhino device can read.

Nothing about this needs the supply interrupted, which is why utility submetering is usually the easiest part of a retrofit to schedule.

None of this covers site feasibility. RF range, cabinet access and power availability are survey questions, and a compatibility yes is not an installation yes.

Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.

One meter checked. Now do the building.

Send us the meter list for the site and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site. Before anyone talks about price.