Lösungen
KostensenkungESG & ComplianceMieterabrechnung & MieterbindungImmobilienverwaltungPortfoliobetriebUtility Data API
Produkt
PlattformStrommonitoringWassermonitoringGasmonitoringWärmemonitoringSolarmonitoringDatenquellenHardwareUtility ConnectorsDrittanbieter-Infrastruktur
Tools
Alle ToolsZähler-KompatibilitätAbdeckung von Versorgern
Branchen
Alle BranchenLogistikEinzelhandelBüroWohnimmobilienStudentisches WohnenHotellerieGesundheitsimmobilien
FallstudienBlogPartner
ENNLPL
Demo buchen

Pozyton meters Rhino reads

Rhino has configured Pozyton meters across electricity, read over RS232 optic head, IEC1107, RS485 IEC1107 and RS485 Modbus.

6 of them measure through current transformers, which is the part of a Pozyton install worth checking before anything is scheduled: the CTs either exist already or an electrician has to add them. 6 carry MID certification, so their readings can be used to bill tenants.

What you see here is what Rhino has already configured. It is not the limit of what Rhino can read from Pozyton: any model on Modbus or M-Bus connects to the access point whether or not it appears below.

Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.

Already configured

Pozyton models we have already configured.

As of 2026-08-25, and more are added every few months. A model we have not configured yet is a different thing from one we cannot read.

ModelUtilityProtocolMIDWatch out for
EABMElectricityRS232 optic head, IEC1107YesNeeds CTs
EQABPElectricityRS232 optic head, IEC1107YesNeeds CTs
EQMElectricityRS485 IEC1107YesNeeds CTs
sEAElectricityRS485 ModbusYesNeeds CTs
sEABElectricityRS485 ModbusYesNeeds CTs
SQABElectricityRS485 IEC1107 and RS485 ModbusYesNeeds CTs

Got a building full of Pozyton meters?

Send us the meter list and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site. Before anyone talks about price.