Legrand meters Rhino reads
Rhino has configured Legrand meters across electricity, read over Pulse / S0 and RS485 Modbus.
3 of them measure through current transformers, which is the part of a Legrand install worth checking before anything is scheduled: the CTs either exist already or an electrician has to add them. 3 carry MID certification, so their readings can be used to bill tenants.
What you see here is what Rhino has already configured. It is not the limit of what Rhino can read from Legrand: any model on Modbus or M-Bus connects to the access point whether or not it appears below.
Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.
Legrand models we have already configured.
As of 2026-08-25, and more are added every few months. A model we have not configured yet is a different thing from one we cannot read.
| Model | Utility | Protocol | MID | Watch out for |
|---|---|---|---|---|
| 046 74 | Electricity | Pulse / S0 | No | Needs CTs |
| 046 83 | Electricity | RS485 Modbus | No | Nothing |
| 412052 | Electricity | RS485 Modbus | No | Needs CTs |
| 412075 | Electricity | RS485 Modbus | Yes | Nothing |
| 412091 | Electricity | RS485 Modbus | No | Nothing |
| 412093 | Electricity | RS485 Modbus | Yes | Nothing |
| 4686 | Electricity | RS485 Modbus | Yes | Needs CTs |
Got a building full of Legrand meters?
Send us the meter list and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site. Before anyone talks about price.