Lösungen
KostensenkungESG & ComplianceMieterabrechnung & MieterbindungImmobilienverwaltungPortfoliobetriebUtility Data API
Produkt
PlattformStrommonitoringWassermonitoringGasmonitoringWärmemonitoringSolarmonitoringDatenquellenHardwareUtility ConnectorsDrittanbieter-Infrastruktur
Tools
Alle ToolsZähler-KompatibilitätAbdeckung von Versorgern
Branchen
Alle BranchenLogistikEinzelhandelBüroWohnimmobilienStudentisches WohnenHotellerieGesundheitsimmobilien
FallstudienBlogPartner
ENNLPL
Demo buchen
Integratable

Is the Landis Gyr ZMQ202 compatible with remote monitoring?

Yes. The Landis Gyr ZMQ202 connects, and the one detail we do not have on file yet is which interface your unit carries.

Utility
Electricity
Interfaces Rhino reads
Not on file yet
Connection method
Indirect
Phases and current
3 phase
MID certified
Yes
Software only possible
No, this one needs hardware
Rhino hardware
Confirmed with you before anything is ordered

Coverage reviewed 2026-08-25, and it grows continuously.

The answer that matters

What it takes.

Rhino has the Landis Gyr ZMQ202 configured already, so the connection is proven rather than probable.
What the install looks like depends on the building and on which version of the meter is installed, so Rhino sizes it with you rather than reading it off a model number. That is one short conversation.
On site

What connecting it involves.

The Landis Gyr ZMQ202 measures through current transformers rather than carrying the load itself. That makes the meter side of the job small and the electrical side of it the part to plan around: the CTs sit on the cable, and getting to them usually means arranging a window when that circuit can be taken down.

Where the transformers are already installed, which is common on anything metered at a distribution board, the work is limited to wiring the Rhino expansion device to the meter output and pairing it with the access point.

None of this covers site feasibility. RF range, cabinet access and power availability are survey questions, and a compatibility yes is not an installation yes.

Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.

Same manufacturer

Other Landis Gyr meters we read.

ModelUtilityProtocolMID
E350ElectricityAsk usNo
E360ElectricityAsk usNo
UH50 (T550)HeatM-Bus wired, RS485 Modbus and Wireless M-Bus OMS
ZMD310ElectricityRS232 optic head, IEC1107Yes
ZMD405ElectricityAsk usNo
ZMD410ElectricityAsk usNo
ZMG310ElectricityAsk usNo
ZMG405ElectricityRS232 optic head, IEC1107 and RS485 IEC1107Yes

One meter checked. Now do the building.

Send us the meter list for the site and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site. Before anyone talks about price.