F&F meters Rhino reads
Rhino has configured F&F meters across electricity, read over Pulse / S0, RS485 Modbus and M-Bus wired.
4 of them measure through current transformers, which is the part of a F&F install worth checking before anything is scheduled: the CTs either exist already or an electrician has to add them. 13 carry MID certification, so their readings can be used to bill tenants.
What you see here is what Rhino has already configured. It is not the limit of what Rhino can read from F&F: any model on Modbus or M-Bus connects to the access point whether or not it appears below.
Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.
F&F models we have already configured.
As of 2026-08-25, and more are added every few months. A model we have not configured yet is a different thing from one we cannot read.
| Model | Utility | Protocol | MID | Watch out for |
|---|---|---|---|---|
| LE-01d | Electricity | Pulse / S0 | Yes | Nothing |
| LE-01M | Electricity | Pulse / S0 and RS485 Modbus | Yes | Nothing |
| LE-01MQ | Electricity | RS485 Modbus | Yes | Nothing |
| LE-01MW | Electricity | RS485 Modbus | Yes | Nothing |
| LE-02d | Electricity | Pulse / S0 | Yes | Nothing |
| LE-03d | Electricity | Pulse / S0 | Yes | Nothing |
| LE-03d CT | Electricity | Pulse / S0 | Yes | Needs CTs |
| LE-03M CT | Electricity | Pulse / S0 and RS485 Modbus | No | Needs CTs |
| LE-03MB | Electricity | M-Bus wired | Yes | Nothing |
| LE-03MP | Electricity | RS485 Modbus | No | Nothing |
| LE-03MQ | Electricity | RS485 Modbus | Yes | Nothing |
| LE-03MQ CT | Electricity | RS485 Modbus | Yes | Needs CTs |
| LE-03MW | Electricity | RS485 Modbus | Yes | Nothing |
| LE-03MW CT | Electricity | RS485 Modbus | Yes | Needs CTs |
| WZE-3 | Electricity | Pulse / S0 | Yes | Nothing |
Got a building full of F&F meters?
Send us the meter list and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site. Before anyone talks about price.