Oplossingen
KostenreductieESG & ComplianceHuurdersfacturatie & betrokkenheidVastgoedbeheerPortefeuillebeheerUtility Data API
Product
PlatformElektriciteitsmonitoringWatermonitoringGasmonitoringWarmtemonitoringZonnestroommonitoringDatabronnenHardwareUtiliteitsconnectorenInfrastructuur van derden
Tools
Alle toolsMetercompatibiliteitDekking energieleveranciers
Industrieën
Alle industrieënLogistiekRetailKantoorResidentieelStudentenhuisvestingHospitalityZorgvastgoed
Case studiesBlogPartners
ENPLDE
Demo aanvragen

Siemens meters Rhino reads

Rhino has configured Siemens meters across electricity, water and heat, read over RS485 Modbus, Ethernet Modbus TCP/IP and Wireless M-Bus OMS.

3 of them measure through current transformers, which is the part of a Siemens install worth checking before anything is scheduled: the CTs either exist already or an electrician has to add them. 2 carry MID certification, so their readings can be used to bill tenants.

What you see here is what Rhino has already configured. It is not the limit of what Rhino can read from Siemens: any model on Modbus or M-Bus connects to the access point whether or not it appears below.

Any meter that speaks Modbus or M-Bus connects to the Rhino AP, whether or not we have set that model up before. What we have already configured is a record of past work, not a boundary. Tell us what you have at sales@rhino.energy and we will name the device you need.

Already configured

Siemens models we have already configured.

As of 2026-08-25, and more are added every few months. A model we have not configured yet is a different thing from one we cannot read.

ModelUtilityProtocolMIDWatch out for
7KT1662ElectricityRS485 ModbusYesNeeds CTs
7KT1666ElectricityRS485 ModbusYesNothing
FMT020WaterAsk usInterface not on file yet
MAG6000WaterAsk usInterface not on file yet
PAC3200ElectricityEthernet Modbus TCP/IPNoNeeds CTs
PAC4200ElectricityEthernet Modbus TCP/IPNoNeeds CTs
WSM515HeatAsk usInterface not on file yet

Got a building full of Siemens meters?

Send us the meter list and we will come back with the device per meter, the transformers and adapters it needs, and the parts of the job that need an electrician on site. Before anyone talks about price.